Before and after pictures of repair work recently carried out to 20 tonne dump trailer. The whole floor and part of the sides of the trailer were replaced with 6mm steel plate. The trailer was fully seam welded all round and also plug welded throughout. Some light repair work carried out on the tail board also.

Leave a Reply

Your email address will not be published. Required fields are marked *